Sara Leathers’ second facility, developed in Ranipet, extends over 25,000 sq. ft and was built for leather processing and product manufacturing. The factory required a controlled work environment to support wet and dry processing, drying, and finishing stages.
The facility’s design involved chemical-resistant materials, overhead structural clearance for drying systems, and side bays for logistics movement. The structure was completed using PEB frameworks with extended bay spacing, giving the factory a modern, open-plan workflow for industrial-grade operations.
This factory continues to serve as a key production unit in the leather industry cluster of Ranipet.
location
Ranipet
sector
Factory
scope of work
25,000 sq. ft
completion date
2014
Leading experts in pre-engineered buildings and industrial construction.
Copyright © 2025 MRB PEB Structure Pvt Ltd. All Rights Reserved.
Powered by Instancers