Eskay Cartons’ manufacturing unit in Manimangalam was developed as a large-format packaging production facility, covering 30,000 sq. ft. The structural planning focused on smooth machine layout, raw material handling, and a dust-controlled environment to suit packaging production processes.
Built with pre-engineered steel frameworks, the factory features high ceilings and column-free spans that accommodate large-scale equipment setups. Adequate natural lighting and ventilation provisions were incorporated to ensure a healthy and energy-efficient workspace.
The project stands as a testament to MRB PEB’s early footprint in delivering high-capacity industrial facilities with enduring build quality.
location
Manimangalam
sector
Factory
scope of work
30,000 sq. ft
completion date
August 2014
Leading experts in pre-engineered buildings and industrial construction.
Copyright © 2025 MRB PEB Structure Pvt Ltd. All Rights Reserved.
Powered by Instancers